QuickCalc.ai
Home & Construction

How to Calculate Concrete for a Slab

The cubic-yard formula for a concrete slab, standard thickness by use case, and how to convert your total into bag count or a ready-mix order.

Concrete is priced and delivered by volume, so the core task is converting a flat slab area into cubic yards — the unit ready-mix trucks and most suppliers actually quote.

The formula

  1. Area (sq ft) = length × width
  2. Volume (cu ft) = area × thickness (in feet — divide inches by 12)
  3. Cubic yards = volume in cu ft ÷ 27

Standard slab thickness by use

UseTypical thickness
Walkway / sidewalk4 in
Patio4 in
Standard driveway5-6 in
RV pad / heavy-duty6 in or more

Worked example

A 10×10 ft patio at 4 inches thick: area = 100 sq ft, thickness = 4 ÷ 12 = 0.333 ft, volume = 100 × 0.333 = 33.3 cu ft, cubic yards = 33.3 ÷ 27 ≈ 1.23 cu yd. For bagged concrete, a 60 lb bag yields about 0.45 cu ft and an 80 lb bag about 0.60 cu ft — so 33.3 cu ft needs roughly 56 bags at 60 lb or 42 bags at 80 lb, before any waste margin.

The Concrete, Mulch & Topsoil Calculator runs this conversion automatically and shows both the bag count and the cubic yard total to give a ready-mix supplier.